Pole Work in Several Towns. No outages are expected. Learn more.

Electric Service - Getting Started

Electric Service & System

Getting or Changing Electric Service

Building a new home? Upgrading your electric service? Relocating power lines? Find the right application, learn what to expect, and explore example costs for your project.

What Type of Service Do You Need?

Choose the option that best describes your project to get started. You can review the process and potential costs further down this page.

New Electric Service

Building a new home, business, or facility? Start here. Also use this application for temporary construction power.

New Service Application

Increase Capacity

Adding equipment, expanding operations, or upgrading your electrical panel and need more capacity?

Increase Capacity Application

Relocate or Change Service

Moving existing electric lines, changing the service connection, or switching from overhead to underground?

Line Change Application

LED Security Lighting

Would you like to request an LED security light for your property?

Security Light Application

Transferring or reconnecting an existing service? Contact Member Services at 802-635-2331 or 800-832-2667 instead of submitting a construction application.

How the Service Process Works

Here is a general overview of the steps involved. Your project may require additional reviews, permits, or easements.

1

Apply

Submit the appropriate application.

2

Review

VEC reviews project information and engineering fee.

3

Site Visit

A utility designer assesses the project.

4

Estimate

Complete the required paperwork and payment.

5

Construction

Approved, paid projects enter the construction queue.

Planning an electrical upgrade? Notify VEC before connecting substantial additional electric load. Changes may require upgraded utility equipment and additional costs.

Estimated Electric Service Costs

The prices below are examples to help you plan. A site visit is required to evaluate your specific project and determine estimated costs.

Engineering Fee
$250

An application and engineering fee are required before a site visit can be scheduled.

Qualifying New Residential Service Credit
$566

Applied to the listed new-service estimates for qualifying single- or multi-family homes; not for commercial buildings, garages, sheds, or unoccupied buildings.

New Overhead Service — Under 100 Feet

100–200 amp overhead secondary from the pole to the building attachment point.

Example workEstimate
VEC hangs service wire, installs bracket, makes connections; transformer already exists~$2,100
Same work, but a transformer is required~$6,100
New Underground Service — Under 250 Feet

100–200 amp underground secondary from a transformer to the service location.

Example workEstimate
Pole-mounted: hang service loop; transformer already exists~$1,600
Pole-mounted: transformer required~$5,500
Underground vault: open vault and connect; transformer already exists~$1,600
Underground vault: transformer required~$5,200
Overhead Line Extensions — Over 250 Feet

Examples include a transformer and assume approximately 250–275 feet maximum between poles. Vegetation clearing and setting poles in ledge are not included.

Example extensionEstimate
1 pole (~275 ft)~$15,800
2 poles (~550 ft)~$22,600
3 poles (~825 ft)~$30,200
4 poles (~1,100 ft)~$37,000
Underground Line Extensions — Over 250 Feet

Examples include a pad-mounted transformer. Vaults are generally spaced a maximum of approximately 500–600 feet apart. Trenching and conduit costs are not included.

Example extensionEstimate
~550 ft~$18,500
~1,100 ft~$26,400
~1,650 ft~$34,400
~2,200 ft~$42,400
Existing Service Upgrades & Line Changes

Example costs for upgrading from 100 amp to 200 amp service or converting an overhead connection to underground.

Example workEstimate
VEC equipment sufficient; one trip, no more than one hour, while electrician upgrades meter socket$343
VEC equipment sufficient; two trips, no more than one hour each, while electrician upgrades meter socket$686
New service riser; existing transformer sufficient~$1,600
New service riser and overhead transformer~$4,800
New pad-mounted transformer~$3,400
Replace 100–200 amp overhead service to building with underground service~$1,600

All line changes and upgrades to 400 amps or greater are billed at actual cost. A site visit is needed to provide an estimate.

Important Information About Estimates

  • Example amounts are for reference only. Actual costs depend on conditions identified during a site visit.
  • VEC does not provide trenching or conduit; obtain separate contractor estimates.
  • For underground secondary, the member or electrician must provide and install wire and conduit between the transformer and building.
  • Traffic control is not included and will be assessed on a case-by-case basis.
  • Unlisted work requires review by a utility designer before an estimate can be given.

Before Construction Begins

A few important preparations can help your project move forward smoothly.

Getting Started & Planning Ahead
  • Contact an electrician early to discuss your project.
  • Submit your VEC service application well before the date you need power. Easements, permits, and special construction may be required.
  • Coordinate project requirements and scheduling with VEC before beginning service-related work.
Dig Safe & Underground Utility Marking

If you need underground utility lines marked for the power leading to your home, please note that VEC does not provide this service.

  1. Call 811 to contact Dig Safe and obtain a ticket number.
  2. Contact ITG Locates at 207-852-8315 and provide the Dig Safe ticket number.
  3. Coordinate the utility marking visit with ITG Locates.
Planning a 400-Amp or Larger Service?

New or upgraded services of 400 amps or more may experience substantial delays because of specialized electric distribution equipment supply constraints. Submit your application as early as possible. See the pricing and process details below for actual-cost and true-up terms.

Information for Electricians & Contractors

Technical requirements, advance coordination, and helpful resources for electrical professionals working on VEC service projects.

Meter Removal & Reconnection

Removing one of VEC's RF meters sends an outage indication to the control center. To avoid an unnecessary outage response and possible charges, call VEC at 800-832-2667 or 802-635-2331 before a planned meter pull.

Coordinate any associated service disconnection or reconnection with VEC in advance.

Service Upgrades & Increased Electrical Load

Before a panel upgrade, service-capacity increase, or installation of significant new electrical loads, contact VEC to confirm whether the existing transformer and distribution facilities can support the proposed work.

VEC designs facilities to meet electrical demand at the time of initial service. Additional utility upgrades may be necessary at the member's expense.

For applicable projects, use the Increase Capacity Application. Service-upgrade cost examples are listed above in Estimated Electric Service Costs.

Meter Sockets & Service Equipment

Review the applicable meter socket, service entrance, equipment, and inspection requirements before ordering materials or starting installation. Equipment and installation details should follow VEC's current standards and service guidelines.

Underground Service, Wire & Conduit

VEC does not provide trenching or conduit. For underground secondary service, the member or electrician must provide and install wire and conduit between the transformer and building, following applicable VEC requirements.

Coordinate conduit placement and other project details with VEC before work begins. Review the guidelines and construction standards for current technical requirements.

Temporary Construction Power

Requests for temporary power during construction are submitted using VEC's New Service Application. Discuss temporary service needs with VEC early so they can be included in project planning.

Construction Standards, Load Sheets & Forms

Use VEC's current construction standards and electrical service guidelines when planning service entrances, metering, clearances, and related equipment.

Load sheets and meter certification forms may also be available from VEC's Forms menu. Use the current version appropriate to the project.

Easements & Property Access

An easement may be required when VEC equipment needs to be located on or across private property. Start by completing an application and meeting with a VEC field engineer.

Prepare Your Easement Information

Use the checklist to gather the property records VEC needs to prepare an easement.

Download Easement Checklist (PDF)
What is an easement?

An easement is a legal document granting VEC permission to access property to construct and maintain equipment needed to provide electric service. Completed easements are recorded in local land records at the Town Clerk's Office.

When should I start the easement process?

First submit the appropriate VEC service application and meet with a VEC field engineer. The field engineer helps confirm the route of utility lines on your property or neighboring property before you prepare easement records.

What property documents will I need?

Complete the Easement Information Checklist and provide all of the following for each affected property:

  • A full copy of the recorded property deed, including the book/page number and recording date.
  • A tax map showing parcel boundaries and identifying adjoining property owners.

These records are available through the local Town Clerk's Office. Missing or incomplete records may delay service.

What if the electric line crosses my neighbor's property?

VEC will need an easement from each affected neighboring property owner. Complete a separate checklist for each property and speak with neighbors early to help avoid delays.

What if the property has a conservation easement?

Contact the organization holding the conservation easement, such as the Vermont Land Trust, in advance to review project plans and necessary easement arrangements.

Can VEC help with land records or negotiating an easement?

VEC does not research land records or negotiate easements for applicants. You may wish to consult a legal or land-use professional. Previously listed resources include Rob Naramore, Naramore ROW Services (802-744-6477), and Stephen Taylor, Deerleap Communications (802-349-0778).

Editor review: confirm these outside contact listings are still current before publishing.

Service Pricing & Project Details

Estimate validity: Estimates are valid for 30 days. Once VEC receives payment, the project enters the construction queue.

How are final construction costs determined?

Estimates are based on known or predicted conditions. Actual costs may vary due to items such as poles and anchors installed in ledge, permits, additional design work, specialized equipment, and changes in filed tariff rates.

All change-of-service estimates and new service installations of 400 amps or greater are subject to a true-up after work is completed, reviewed, and finalized.

What could delay my project?

Project timing may be affected by missing easements or permits, incomplete member-provided construction work, specialized equipment lead times, or other site-specific issues. Contact VEC well before your desired service date.

What work or materials am I responsible for?

Depending on the project, the member may be responsible for land records and easements, right-of-way clearing, permits, trenching, conduit, backfill, underground secondary wire, and electrician-installed equipment. The project estimate and VEC's applicable tariff and service guidelines control final responsibilities.

Service Area & Engineering Contacts

Unsure whether your property is in VEC's territory or have questions about your project? Review the service area and contact our team.