Construction Standards
VEC Electric Service Requirements Manual
Standard Number |
Description |
50 Foot ROW |
|
30 Foot ROW |
|
Clearance around a padmount |
|
Overhead service |
|
Mast overhead service |
|
Underground service - Pole |
|
Underground service - Padmount |
|
Pole metering |
|
Trench cross section |
|
Typical meter pedestal - Pole |
|
Typical meter pedestal - Padmount |
|
Typical meter pedestal – Current Transformer Meter |
|
Typical multiple meter Pedestal |
|
Typical temporary service - Pedestal |
|
Typical temporary service - Underground |
|
Typical temporary to permanent underground service |
|
Typical temporary service - Pole |
|
Clearance between electric meters and L.P. or Natural Gas equipment |
|
Typical switching of customers emergency supply |
|
Typical switching of customers emergency supply – alternate connection |
|
Generation in parallel with utility system non-net metering with energy sales contract |
|
Generation in parallel with utility system non-net metering with – peak shaving |
|
Generation in parallel with utility system net metering with – recommended connection |
|
Generation in parallel with utility system net metering with – alternate connection |
|
Generation in parallel with utility system net metering with – alternate connection |
|
Generation in parallel with utility system net metering with – with generation meter |
|
Meter Socket Specifications |
|
Single-phase installation 3 wire 1 phase and network |
|
Self-contained polyphase installation |
|
Transformer rated metering installation with instrument transformer enclosure |
|
Trenching and conduit depths for primary extensions |
|
Service extension with insufficient burial depth |
|
Primary underground system |
|
Primary underground system - drainage |
|
Typical bollard detail |
|
Vault guarding with bollards |
|
Mobile Home - Stubpost |
|
Mobile Home – Meter on Pole |